Continuous integration (CI) plays an important role in agile development. iceScrum Pro integrates build information from your CI server so you don’t have to leave iceScrum in order to check that your builds pass. This integration also allows traceability between stories and the builds in which they are implemented.

Principles

iceScrum Pro provides a generic data structure to store build information. It is sent by a CI server through the iceScrum Web Services API. For Jenkins/Hudson, we provide a plugin that does that automatically.

Builds, jobs and project

Build information is sent when your CI server constructs your application by following instructions described in a job.

Build information mainly describes the build name, number, date, job and status. When sent to iceScrum, build information must be associated with a project (you can associate several jobs with a project). iceScrum Pro knows that builds belong to the same job according to the job name that is provided.

The Dashboard displays the latest build information for each job associated with the project. On the left, the job name is displayed. The build name color depends on the build status. You will get more information by hovering over it.

Builds, tasks and stories

Within a project, build information can optionally be associated with one or many tasks. Then, the “+” button allows expanding it to display the associated tasks. If these tasks belongs to stories then they are also displayed.

Build information is also displayed in task and story details views according to this association. Unlike the dashboard information which displays only the latest build per job, all the associated builds are displayed.

The Jenkins/Hudson plugin include tasks in build information if they are found in commit messages according to this pattern: T<taskUID>[-<taskEstimation>]. This pattern is the one we defined for SCM integration. Consequently, if you already use this iceScrum Pro feature, builds will be associated with your tasks automatically.

Configuration

There is no particular configuration on your iceScrum server, just be sure that CI integration is enabled in your project settings (it is disabled by default). Because they are required, Web Services are enabled automatically when you enable CI integration.

Plugins

This section describes how to configure the integration with your CI server. For the moment, only a Jenkins plugin is available. If you would like to have a new plugin developed by our team, please contact us. Let us know if you want to develop it on your own so we may consider making it available for everybody.

Jenkins/Hudson plugin

If you use Jenkins, you can install the iceScrum plugin directly from the Manage Jenkins > Manage Plugins menu. You will find it under the Available tab (it is named iceScrum plugin). Choose Download now and install after restart.

If you use Hudson, you will have to install the plugin manually. Download the latest icesrum.hpi file into the $HUDSON_HOME/plugins directory and restart Hudson.

Once your Jenkins server is restarted, you can configure the connection to iceScrum Pro in the iceScrum settings panel of your job configuration. You must enter credentials of a user who is in your team. Then, enter your project URL:
[ruby classname=”api-url”]http://:server/p/:pkey[/ruby]
If you use iceScrum Pro Cloud, the URL will be:
[ruby classname=”api-url”]https://www.icescrum.com/a/p/:pkey[/ruby]

Before going further, check you credentials with the Test credentials button. Then, add the iceScrum post-build action that will send your build data to your iceScrum server.

If you have multiple jobs for your iceScrum project, don’t forget to add the post-build action to all of them. Then, the plugin will automatically send build data to your iceScrum project for each build that includes commits with the iceScrum task naming pattern.

Web Services API

Build Web Services are available only if CI integration and Web Services are enabled on the project. Please refer to the main iceScrum API documentation for more information.

Get all builds

[ruby classname=”api-url”]GET http://:server/ws/p/:pkey/build[/ruby]

[js classname=”api-response” collapse=”true” title=”JSON Response”]
[
{
"id": 1,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-01T02:21:03Z",
"jobName": "iceScrum",
"name": "#533",
"number": 533,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1246
},
{
"id": 1245
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/533"
},
{
"id": 2,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-01T02:26:52Z",
"jobName": "iceScrum",
"name": "#534",
"number": 534,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1246
},
{
"id": 1245
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/534"
},
{
"id": 3,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:34:07Z",
"jobName": "iceScrum-core",
"name": "#305",
"number": 305,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum-core/305"
},
{
"id": 4,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:35:26Z",
"jobName": "iceScrum",
"name": "#538",
"number": 538,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/538"
},
{
"id": 5,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:38:01Z",
"jobName": "iceScrum_Cloud",
"name": "#200",
"number": 200,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum_Cloud/200"
},
{
"id": 6,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:41:00Z",
"jobName": "iceScrum_Pro",
"name": "#69",
"number": 69,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum_Pro/69"
},
{
"id": 13,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-03T02:01:09Z",
"jobName": "iceScrum",
"name": "#539",
"number": 539,
"product": {
"id": 1
},
"status": 1,
"tasks": [],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/539"
},
{
"id": 14,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-04T00:42:04Z",
"jobName": "iceScrum-core",
"name": "#306",
"number": 306,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1170
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum-core/306"
},
{
"id": 15,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-04T00:43:34Z",
"jobName": "iceScrum",
"name": "#540",
"number": 540,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1170
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/540"
}
]
[/js]
[xml classname=”api-response” collapse=”true” title=”XML Response”]
<?xml version="1.0" encoding="UTF-8"?>
<list>
<build id="1">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-01 02:21:03.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#533</name>
<number>533</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1246" />
<task id="1245" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/533</url>
</build>
<build id="2">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-01 02:26:52.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#534</name>
<number>534</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1246" />
<task id="1245" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/534</url>
</build>
<build id="3">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:34:07.0 UTC</date>
<jobName>iceScrum-core</jobName>
<name>#305</name>
<number>305</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum-core/305</url>
</build>
<build id="4">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:35:26.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#538</name>
<number>538</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/538</url>
</build>
<build id="5">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:38:01.0 UTC</date>
<jobName>iceScrum_Cloud</jobName>
<name>#200</name>
<number>200</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum_Cloud/200</url>
</build>
<build id="6">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:41:00.0 UTC</date>
<jobName>iceScrum_Pro</jobName>
<name>#69</name>
<number>69</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum_Pro/69</url>
</build>
<build id="13">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-03 02:01:09.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#539</name>
<number>539</number>
<product id="1" />
<status>1</status>
<tasks />
<url>http://tools.icescrum.org/jenkins/job/iceScrum/539</url>
</build>
<build id="14">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-04 00:42:04.0 UTC</date>
<jobName>iceScrum-core</jobName>
<name>#306</name>
<number>306</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1170" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum-core/306</url>
</build>
<build id="15">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-04 00:43:34.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#540</name>
<number>540</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1170" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/540</url>
</build>
</list>
[/xml]

Get the latest build for each job

You will get the same builds as displayed on the project dashboard.

[ruby classname=”api-url”]GET http://:server/ws/p/:pkey/build/latest[/ruby]

[js classname=”api-response” collapse=”true” title=”JSON Response”]
[
   {
      "id": 42,
      "builtOn": "Jenkins: 1.516",
      "date": "2013-06-12T00:51:38Z",
      "jobName": "iceScrum_Pro",
      "name": "#76",
      "number": 76,
      "product": {
         "id": 1
      },
      "status": 1,
      "tasks": [
         {
            "id": 1261
         },
         {
            "id": 1260
         }
      ],
      "url": "http://tools.icescrum.org/jenkins/job/iceScrum_Pro/76"
   },
   {
      "id": 41,
      "builtOn": "Jenkins: 1.516",
      "date": "2013-06-12T00:47:32Z",
      "jobName": "iceScrum_Cloud",
      "name": "#207",
      "number": 207,
      "product": {
         "id": 1
      },
      "status": 1,
      "tasks": [
         {
            "id": 1261
         },
         {
            "id": 1260
         }
      ],
      "url": "http://tools.icescrum.org/jenkins/job/iceScrum_Cloud/207"
   },
   {
      "id": 40,
      "builtOn": "Jenkins: 1.516",
      "date": "2013-06-12T00:44:25Z",
      "jobName": "iceScrum",
      "name": "#547",
      "number": 547,
      "product": {
         "id": 1
      },
      "status": 1,
      "tasks": [
         {
            "id": 1261
         }
      ],
      "url": "http://tools.icescrum.org/jenkins/job/iceScrum/547"
   },
   {
      "id": 39,
      "builtOn": "Jenkins: 1.516",
      "date": "2013-06-12T00:42:42Z",
      "jobName": "iceScrum-core",
      "name": "#312",
      "number": 312,
      "product": {
         "id": 1
      },
      "status": 1,
      "tasks": [
         {
            "id": 1261
         }
      ],
      "url": "http://tools.icescrum.org/jenkins/job/iceScrum-core/312"
   }
]
[/js]
[xml classname=”api-response” collapse=”true” title=”XML Response”]
<?xml version="1.0" encoding="UTF-8"?>
<list>
<build id="42">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-12 00:51:38.0 UTC</date>
<jobName>iceScrum_Pro</jobName>
<name>#76</name>
<number>76</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1261" />
<task id="1260" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum_Pro/76</url>
</build>
<build id="41">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-12 00:47:32.0 UTC</date>
<jobName>iceScrum_Cloud</jobName>
<name>#207</name>
<number>207</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1261" />
<task id="1260" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum_Cloud/207</url>
</build>
<build id="40">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-12 00:44:25.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#547</name>
<number>547</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1261" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/547</url>
</build>
<build id="39">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-12 00:42:42.0 UTC</date>
<jobName>iceScrum-core</jobName>
<name>#312</name>
<number>312</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1261" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum-core/312</url>
</build>
</list>
[/xml]

Get all builds for the given story

[ruby classname=”api-url”]GET http://:server/ws/p/:pkey/build/story/:storyId[/ruby]

[js classname=”api-response” collapse=”true” title=”JSON Response”]
[
{
"id": 3,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:34:07Z",
"jobName": "iceScrum-core",
"name": "#305",
"number": 305,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum-core/305"
},
{
"id": 4,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:35:26Z",
"jobName": "iceScrum",
"name": "#538",
"number": 538,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/538"
},
{
"id": 5,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:38:01Z",
"jobName": "iceScrum_Cloud",
"name": "#200",
"number": 200,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum_Cloud/200"
},
{
"id": 6,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:41:00Z",
"jobName": "iceScrum_Pro",
"name": "#69",
"number": 69,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum_Pro/69"
},
{
"id": 1,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-01T02:21:03Z",
"jobName": "iceScrum",
"name": "#533",
"number": 533,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1246
},
{
"id": 1245
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/533"
},
{
"id": 2,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-01T02:26:52Z",
"jobName": "iceScrum",
"name": "#534",
"number": 534,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1246
},
{
"id": 1245
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/534"
}
]
[/js]
[xml classname=”api-response” collapse=”true” title=”XML Response”] <?xml version="1.0" encoding="UTF-8"?>
<list>
<build id="3">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:34:07.0 UTC</date>
<jobName>iceScrum-core</jobName>
<name>#305</name>
<number>305</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum-core/305</url>
</build>
<build id="4">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:35:26.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#538</name>
<number>538</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/538</url>
</build>
<build id="5">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:38:01.0 UTC</date>
<jobName>iceScrum_Cloud</jobName>
<name>#200</name>
<number>200</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum_Cloud/200</url>
</build>
<build id="6">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:41:00.0 UTC</date>
<jobName>iceScrum_Pro</jobName>
<name>#69</name>
<number>69</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum_Pro/69</url>
</build>
<build id="1">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-01 02:21:03.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#533</name>
<number>533</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1245" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/533</url>
</build>
<build id="2">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-01 02:26:52.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#534</name>
<number>534</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1245" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/534</url>
</build>
</list>
[/xml]

Get all builds for the given task

[ruby classname=”api-url”]GET http://:server/ws/p/:pkey/build/task/:taskId[/ruby]

[js classname=”api-response” collapse=”true” title=”JSON Response”]
[
{
"id": 1,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-01T02:21:03Z",
"jobName": "iceScrum",
"name": "#533",
"number": 533,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1245
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/533"
},
{
"id": 2,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-01T02:26:52Z",
"jobName": "iceScrum",
"name": "#534",
"number": 534,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1245
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum/534"
}
]
[/js]
[xml classname=”api-response” collapse=”true” title=”XML Response”]
<?xml version="1.0" encoding="UTF-8"?>
<list>
<build id="1">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-01 02:21:03.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#533</name>
<number>533</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1246" />
<task id="1245" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/533</url>
</build>
<build id="2">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-01 02:26:52.0 UTC</date>
<jobName>iceScrum</jobName>
<name>#534</name>
<number>534</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1246" />
<task id="1245" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum/534</url>
</build>
</list>
[/xml]

Create a build

[ruby classname=”api-url”]POST http://:server/ws/p/:pkey/build[/ruby]

Input


build.builtOn
Optional - Name and version of CI server

build.date
Required - Timestamp or ISO 8601 format

build.jobName
Required - Name of the job in your CI server (e.g. myapp)

build.name
Required

build.number
Required integer

build.status
Required integer - 1: success, 5: failed, 10: error

build.tasks
Optional array of number - Array of task UID

build.url
Required

Be careful if you provide tasks. The API expects an array of UID whereas the API usually deals with technical IDs. Additionally, it expects a raw array of numbers rather than the array of task objects you will get in response. Thus, there is a significant inconsistency between what you submit and what you get from the API. This issue will be fixed in a major API refactoring where all technical IDs will be replaced by UIDs.

[js classname=”api-response” collapse=”true” title=”JSON Response”]
{
"id": 3,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:34:07Z",
"jobName": "iceScrum-core",
"name": "#305",
"number": 305,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum-core/305"
}
[/js]
[xml classname=”api-response” collapse=”true” title=”XML Response”]
<?xml version="1.0" encoding="UTF-8"?>
<build id="3">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:34:07.0 UTC</date>
<jobName>iceScrum-core</jobName>
<name>#305</name>
<number>305</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum-core/305</url>
</build>
[/xml]

Get a build

[ruby classname=”api-url”]GET http://:server/ws/p/:pkey/build/:id[/ruby]

[js classname=”api-response” collapse=”true” title=”JSON Response”]
{
"id": 3,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:34:07Z",
"jobName": "iceScrum-core",
"name": "#305",
"number": 305,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum-core/305"
}
[/js]
[xml classname=”api-response” collapse=”true” title=”XML Response”]
<?xml version="1.0" encoding="UTF-8"?>
<build id="3">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:34:07.0 UTC</date>
<jobName>iceScrum-core</jobName>
<name>#305</name>
<number>305</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum-core/305</url>
</build>
[/xml]

Update a build

[ruby classname=”api-url”]PUT http://:server/ws/p/:pkey/build/:id[/ruby]

Input


build.builtOn
Optional - Name and version of CI server

build.date
Required - Timestamp or ISO 8601 format

build.jobName
Required - Name of the job in your CI server (e.g. myapp)

build.name
Required

build.number
Required integer

build.status
Required integer - 1: success, 5: failed, 10: error

build.url
Required

[js classname=”api-response” collapse=”true” title=”JSON Response”]
{
"id": 3,
"builtOn": "Jenkins: 1.516",
"date": "2013-06-02T20:34:07Z",
"jobName": "iceScrum-core",
"name": "#305",
"number": 305,
"product": {
"id": 1
},
"status": 1,
"tasks": [
{
"id": 1254
}
],
"url": "http://tools.icescrum.org/jenkins/job/iceScrum-core/305"
}
[/js]
[xml classname=”api-response” collapse=”true” title=”XML Response”]
<?xml version="1.0" encoding="UTF-8"?>
<build id="3">
<builtOn>Jenkins: 1.516</builtOn>
<date>2013-06-02 20:34:07.0 UTC</date>
<jobName>iceScrum-core</jobName>
<name>#305</name>
<number>305</number>
<product id="1" />
<status>1</status>
<tasks>
<task id="1254" />
</tasks>
<url>http://tools.icescrum.org/jenkins/job/iceScrum-core/305</url>
</build>
[/xml]

Delete a build

[ruby classname=”api-url”]DELETE http://:server/ws/p/:pkey/build/:id[/ruby]


Try it for free now
All you need for your Agile project management